Monthly Archives: November 2016

Defects Of Welded Steel Pipe

Defects Of Welded Steel Pipe Welded steel pipe production process is a steel sheet,strip,and other various molding methods using the straight press roll helical direction curling into a desired cross-sectional shape,and then by means of heart,prssure,different methods of welding weld

Defects Of Welded Steel Pipe

Defects Of Welded Steel Pipe Welded steel pipe production process is a steel sheet,strip,and other various molding methods using the straight press roll helical direction curling into a desired cross-sectional shape,and then by means of heart,prssure,different methods of welding weld

Corrosion Problems of ERW Steel Pipe

ERW steel pipe outer coating of the basic functions,there are two aspects: First,make the ERW steel pipe surface from electrochemical corrosion,bacterial corrosion protection of soil basic physical media. Second,resist the soil medium move creep stress,basic mechanical protection method static sterss

Corrosion Problems of ERW Steel Pipe

ERW steel pipe outer coating of the basic functions,there are two aspects: First,make the ERW steel pipe surface from electrochemical corrosion,bacterial corrosion protection of soil basic physical media. Second,resist the soil medium move creep stress,basic mechanical protection method static sterss

Iron and steel industry prices fell, the reason why?

As we all know, often drop large iron and steel industry, the price is extremely unstable, so what is the cause of this phenomenon?Shinestar Steel Research Institute found through research, technology and the characteristics of the iron and steel industry,

Iron and steel industry prices fell, the reason why?

As we all know, often drop large iron and steel industry, the price is extremely unstable, so what is the cause of this phenomenon?Shinestar Steel Research Institute found through research, technology and the characteristics of the iron and steel industry,

The difference between ERW pipe and HFW pipe

The difference between ERW pipe and HFW pipe ERW call is one of the resistance welding steel pipe, ERW are respectively corresponding to the first letter of the English word. Resistance welding steel pipe can be divided into ac and

The difference between ERW pipe and HFW pipe

The difference between ERW pipe and HFW pipe ERW call is one of the resistance welding steel pipe, ERW are respectively corresponding to the first letter of the English word. Resistance welding steel pipe can be divided into ac and

The price of Spiral steel pipe, ERW steel pipe and LSAW Steel pipe strong gains, detonate market

The price of Spiral steel pipe, ERW steel pipe and LSAW Steel pipe strong gains, detonate market Opening on the first day of November, the steel price of most strong steel mill steel factory continue to pull up, spiral steel

The price of Spiral steel pipe, ERW steel pipe and LSAW Steel pipe strong gains, detonate market

The price of Spiral steel pipe, ERW steel pipe and LSAW Steel pipe strong gains, detonate market Opening on the first day of November, the steel price of most strong steel mill steel factory continue to pull up, spiral steel

Galvanized Steel Pipe Using Advantages

Galvanized Steel Pipe Using Advantages When we talk about the galvanized steel pipes, we usually refer to the hot dipped galvanized steels pipes which are more durable and strengthened than any other types. The cleaning process which the hot dipped

Galvanized Steel Pipe Using Advantages

Galvanized Steel Pipe Using Advantages When we talk about the galvanized steel pipes, we usually refer to the hot dipped galvanized steels pipes which are more durable and strengthened than any other types. The cleaning process which the hot dipped

Advantages of welded pipe

Advantages of welded pipe Structural welded pipe (tubing) can be used for a wide variety of mechanical applications. It may be used either statically or dynamically. Its close tolerances, good finish, and dense structure make it ideal for parts such

Advantages of welded pipe

Advantages of welded pipe Structural welded pipe (tubing) can be used for a wide variety of mechanical applications. It may be used either statically or dynamically. Its close tolerances, good finish, and dense structure make it ideal for parts such

Austenitic Stainless Steel

Austenitic Stainless Steel Low carbon, iron-chromium-nickel stainless alloys containing more than 16% chromium, and 4 to 22% nickel to provide an austenitic structure at normal temperatures. These alloys cannot be hardened by heat treatment, but can be hardened by cold

Austenitic Stainless Steel

Austenitic Stainless Steel Low carbon, iron-chromium-nickel stainless alloys containing more than 16% chromium, and 4 to 22% nickel to provide an austenitic structure at normal temperatures. These alloys cannot be hardened by heat treatment, but can be hardened by cold

SAE/AMS Specifications Sheet

SAE-J356 Welded Flash Controlled Low Carbon Steel Tubing Normalized for Bending. Double Flaring and Beading. Covers normalized electric resistance welded tube ID flash-controlled .005″ to .010″ manipulative quality. SAE-J524 Seamless Low Carbon Steel Tubing Annealed for Bending and Flaring. Covers

SAE/AMS Specifications Sheet

SAE-J356 Welded Flash Controlled Low Carbon Steel Tubing Normalized for Bending. Double Flaring and Beading. Covers normalized electric resistance welded tube ID flash-controlled .005″ to .010″ manipulative quality. SAE-J524 Seamless Low Carbon Steel Tubing Annealed for Bending and Flaring. Covers

The Safe Ways to Use Scaffolding System and Tubes

In high-rise building construction, every step outside the frame to be paved with bamboo basketry or steel fabric, in addition to deaden 1 m high railing and standing bamboo basketry board. On the outer edge of the scaffold, set up

The Safe Ways to Use Scaffolding System and Tubes

In high-rise building construction, every step outside the frame to be paved with bamboo basketry or steel fabric, in addition to deaden 1 m high railing and standing bamboo basketry board. On the outer edge of the scaffold, set up

Vietnam steel industry has high growth potential

According to the Viet Nam Steel Association, the country’s steel industry has great development potential. Speaking at a seminar titled “Viet Nam’s steel industry – rise and fall and development potential” in HCM City on Monday, Dr Nguyen Van Sua

Vietnam steel industry has high growth potential

According to the Viet Nam Steel Association, the country’s steel industry has great development potential. Speaking at a seminar titled “Viet Nam’s steel industry – rise and fall and development potential” in HCM City on Monday, Dr Nguyen Van Sua

Petro China and Malaysia has sighed Sabah Natural Gas Pipeline Project

On the afternoon of November 1, 2016, under the witness of Premier Li Keqiang and Malaysian Prime Mnister Najib Razak, The deputy general manageer of China National Petroleum Corporation (CNPC) Liu Hongbin and the Chairman of Strategic Energy Co., Ltd

Petro China and Malaysia has sighed Sabah Natural Gas Pipeline Project

On the afternoon of November 1, 2016, under the witness of Premier Li Keqiang and Malaysian Prime Mnister Najib Razak, The deputy general manageer of China National Petroleum Corporation (CNPC) Liu Hongbin and the Chairman of Strategic Energy Co., Ltd

In Stock ERW Steel Pipe Price 2016/11/11

  API 5L/A53   GR.B, ERW Steel Pipe, Carbon Steel Outside Diameter Wall Thickness Length Quantity 数量 Remark 标记 EXW CHINA 出厂价 外径 (mm) 壁厚 (mm) 长度 (mtr) PCS 根数 TON 吨位 Surface,End USD/TON 美金每吨 168.3 7.5 5.8 50 14.24 BE. BARE $515.82 355.6 6.8 6.5 75 10.86 BE. BARE $546.80 508.0 13.0 12 6 2.94 BE. BARE $560.27 114.3 9.5 6 30

In Stock ERW Steel Pipe Price 2016/11/11

  API 5L/A53   GR.B, ERW Steel Pipe, Carbon Steel Outside Diameter Wall Thickness Length Quantity 数量 Remark 标记 EXW CHINA 出厂价 外径 (mm) 壁厚 (mm) 长度 (mtr) PCS 根数 TON 吨位 Surface,End USD/TON 美金每吨 168.3 7.5 5.8 50 14.24 BE. BARE $515.82 355.6 6.8 6.5 75 10.86 BE. BARE $546.80 508.0 13.0 12 6 2.94 BE. BARE $560.27 114.3 9.5 6 30

Difficulties in Wall Thickness Control for Straight Seam Steel Pipe Process

Straight seam steel pipe wall thickness control is a difficult production. At present, the straight seam steel pipe manufacturers to improve the wall thickness in the production of precision uses the methods generally including: 1, Tube heating Heating to the

Difficulties in Wall Thickness Control for Straight Seam Steel Pipe Process

Straight seam steel pipe wall thickness control is a difficult production. At present, the straight seam steel pipe manufacturers to improve the wall thickness in the production of precision uses the methods generally including: 1, Tube heating Heating to the

How to Weld for the ERW Steel Pipe in Winter

To ensure that the erw steel pipe in the winter welding perfect follow the following steps: First, increase the welding current welding, slow down the welding speed, the appropriate increase in the cross-sectional area and length of the weld, if

How to Weld for the ERW Steel Pipe in Winter

To ensure that the erw steel pipe in the winter welding perfect follow the following steps: First, increase the welding current welding, slow down the welding speed, the appropriate increase in the cross-sectional area and length of the weld, if

Carbon Steel Alloy-ASTM A53

ASTM A53 is a carbon steel alloy,used as structural steel or for low-pressure plumbing.The alloy specifications are set by ASTM international,in specifications ASTM A53/A53M. A53 pipe comes in three types and two grades,A53 Type F,which is longitudinally furnace butt welded

Carbon Steel Alloy-ASTM A53

ASTM A53 is a carbon steel alloy,used as structural steel or for low-pressure plumbing.The alloy specifications are set by ASTM international,in specifications ASTM A53/A53M. A53 pipe comes in three types and two grades,A53 Type F,which is longitudinally furnace butt welded

Chinese Large Diameter Steel Pipe has Damaged the Canadian Domestic Industry

On Octber 20, 2016, the Canadian International Trade Court (CITT) has made the final decision on Chinese large diameter carbon steel pipe and alloy steel pipe. They announced that the Chinese large diameter steel pipe has damaged the Canadian domestic

Chinese Large Diameter Steel Pipe has Damaged the Canadian Domestic Industry

On Octber 20, 2016, the Canadian International Trade Court (CITT) has made the final decision on Chinese large diameter carbon steel pipe and alloy steel pipe. They announced that the Chinese large diameter steel pipe has damaged the Canadian domestic

Two US oil companies will operate more than 3100 miles of oil line pipe

The US oil line pipe company American Midstream Partners LP said hat the company will acquire peer JPEnergy Partners LP. The transaction will be the whole stock exchange in the form of completion, and will create a valuation of $

Two US oil companies will operate more than 3100 miles of oil line pipe

The US oil line pipe company American Midstream Partners LP said hat the company will acquire peer JPEnergy Partners LP. The transaction will be the whole stock exchange in the form of completion, and will create a valuation of $

President Speech October 30,2016

President Speech October 30,2016 For the enterprise, the customer demand is our chance, transposition is a way to achieve success. Only the product and service start from customer have value and market. To ask, to experience as a customer before produce or promote a new service or product. The General Manager Talking The efficiency of a small team depends on the “leader“, the efficiency of a large team depends on the perfect system and timely communication. In the small team, the leadership and responsibility of the “leader” decide how to division of labor cooperation, how to communication. Afternoon tea How to open a good weekly meeting? A, the purpose of the meeting. The meeting must have a purpose, and this purpose must be specific. The purpose of the weekly meeting is by followingup, refinement, founding the problem, improvement, promoting the monthly goal. B, the agenda. 1, the target completion situation of last week plan. 2, the good aspects and problems in the process, the place need to do improvement. 3, new action plans and goals, the person who responsible of. C, time. Weekly meeting need just one hour, more than 1.5 hours of the meeting must be a waste of time. If you think the meeting content is too much, pls streamline meetings, control it within 1 hour directly. D, information. Is the content of the meeting. Conference contents should strengthen goal oriented, focusing on a target in last week’s action plan and action plan on the new week. I can hear a lot of people reading their own account, the daily work of all say out, this is greatly wasted time. E, as a result. Meeting must has a result, not only refers to the recorder write meeting minutes, it is the meeting action plan on how to implement, target and evaluation standard is what? Who is responsible? What is resource security? In short, to be solve out. Found the problem, and provides the basis for the next step of improvement. Business forefront Wailed salesman must have these problems!1, there is no strong desire to make money, think enough flowers, lose their goals.2, three minutes heat to see whose side colleagues worried, decided to go all out, when the second day wake up pain, began repeating yesterday’s story. 3.Always think that others can succeed is smarter than you, than their high IQ, but human intelligence are very little, than those who work harder, more carefully, more insistent.4, There is no ambition, no sense of honor, do feel good and bad are a kind of.5, No occupation planning, no concept of what they want to do, how long count, muddle along.6, too easy to meet, I feel pretty good, not with the excellent marketing staff than the gap, but with the same level or do worse than meet, in fact, is already in the downhill.7, To understand faithful words grate upon the ear. is not thorough, always think that they think is right, the boss or senior opinion or suggestion wrong, its own way.8, Or over confident, self invincible, no humble attitude. Either too complex, often complain that God unfair.9, Naturally introverted or aloof, not gregarious, can not integrate into the team, often alone, fight a lone battle.10, No gratitude, that their income is the result of their efforts, never want to if you do not think they have this platform. Those aspects need to improve or change. HR forum Performance management system is doing fine again, make it more complicated, without the participation and support of top managers, middle managers lead and guide and employee participation and identity, is unable to promote performance management system.That is to say, “the performance is good, the key in the leadership.”

President Speech October 30,2016

President Speech October 30,2016 For the enterprise, the customer demand is our chance, transposition is a way to achieve success. Only the product and service start from customer have value and market. To ask, to experience as a customer before produce or promote a new service or product. The General Manager Talking The efficiency of a small team depends on the “leader“, the efficiency of a large team depends on the perfect system and timely communication. In the small team, the leadership and responsibility of the “leader” decide how to division of labor cooperation, how to communication. Afternoon tea How to open a good weekly meeting? A, the purpose of the meeting. The meeting must have a purpose, and this purpose must be specific. The purpose of the weekly meeting is by followingup, refinement, founding the problem, improvement, promoting the monthly goal. B, the agenda. 1, the target completion situation of last week plan. 2, the good aspects and problems in the process, the place need to do improvement. 3, new action plans and goals, the person who responsible of. C, time. Weekly meeting need just one hour, more than 1.5 hours of the meeting must be a waste of time. If you think the meeting content is too much, pls streamline meetings, control it within 1 hour directly. D, information. Is the content of the meeting. Conference contents should strengthen goal oriented, focusing on a target in last week’s action plan and action plan on the new week. I can hear a lot of people reading their own account, the daily work of all say out, this is greatly wasted time. E, as a result. Meeting must has a result, not only refers to the recorder write meeting minutes, it is the meeting action plan on how to implement, target and evaluation standard is what? Who is responsible? What is resource security? In short, to be solve out. Found the problem, and provides the basis for the next step of improvement. Business forefront Wailed salesman must have these problems!1, there is no strong desire to make money, think enough flowers, lose their goals.2, three minutes heat to see whose side colleagues worried, decided to go all out, when the second day wake up pain, began repeating yesterday’s story. 3.Always think that others can succeed is smarter than you, than their high IQ, but human intelligence are very little, than those who work harder, more carefully, more insistent.4, There is no ambition, no sense of honor, do feel good and bad are a kind of.5, No occupation planning, no concept of what they want to do, how long count, muddle along.6, too easy to meet, I feel pretty good, not with the excellent marketing staff than the gap, but with the same level or do worse than meet, in fact, is already in the downhill.7, To understand faithful words grate upon the ear. is not thorough, always think that they think is right, the boss or senior opinion or suggestion wrong, its own way.8, Or over confident, self invincible, no humble attitude. Either too complex, often complain that God unfair.9, Naturally introverted or aloof, not gregarious, can not integrate into the team, often alone, fight a lone battle.10, No gratitude, that their income is the result of their efforts, never want to if you do not think they have this platform. Those aspects need to improve or change. HR forum Performance management system is doing fine again, make it more complicated, without the participation and support of top managers, middle managers lead and guide and employee participation and identity, is unable to promote performance management system.That is to say, “the performance is good, the key in the leadership.”

The Classification of Carbon Steel Pipe

Clasified by Production Methods 1. Seamless Steel Pipe – hot rolled seamless steel pipe, cold rolled seamless steel pipe, cold drawn seamless steel pipe 2. Welded Steel Pipe – longitudinal welded pipe, spiral welded pipe, electric resistance welded pipe Classified

The Classification of Carbon Steel Pipe

Clasified by Production Methods 1. Seamless Steel Pipe – hot rolled seamless steel pipe, cold rolled seamless steel pipe, cold drawn seamless steel pipe 2. Welded Steel Pipe – longitudinal welded pipe, spiral welded pipe, electric resistance welded pipe Classified